Archive for the Category »Plumbing «

Water Pump Weekend

This Saturday we wrapped up the fresh water system refit that has been ongoing since last summer. Matt installed the fresh water pump and accumulator tank, which now supplies water to the recently installed galley double sink and bathroom sink and shower.

We also managed to wash and scrub the entire deck, cleaning it of winter grime and dirt. Scrubbing 34 feet of boat deck took the better part of the morning but Kaleo shined like she hasn’t in a long time. Christie finished the to-do list by installing one of her Valentine’s Day presents, a new stainless throttle handle.

All this work was capped off by a great sail in Galveston Bay, where we saw Captain Kidd, a two-masted schooner. The sail also reminded us of how well the Aloha 34 is designed as she balanced herself (stayed on a course without any input from us) on the tack out and back in. The sail was capped off by the best slip-parking job to date, if only they all went that smoothly there would be a few less scratches on the hull.

On Sunday, we spent the afternoon at Christie’s grandmother’s house celebrating the most important date in history, the Resurrection of Jesus Christ. Everyday we thank Him for our talents, abilities and the desire to pursue this dream.

From Single to Double in the Galley

Our original single-basin sink in the galley.
A little caulking romance.
Casey brought me to meet up with Matt while he was working on the new sink install. Looks like he found Kaleo to be pretty relaxing amidst the minor construction. The original single-basin sink in our galley was too shallow & small for any real dishwashing so we went on the search for the right double-basin. After months of research & an exhaustive search for an affordable option, we finally found one on eBay that fit the bill.

After a few weekends more than planned Matt got the old one removed, the counter cut out & the new one in place. In between all that, he managed to add fresh and salt water spigots (for greater water conservation), a new sprayer faucet, and plumbed all the necessary hoses. A now we have a fully functioning sink and an experience Matt hopes to only do once.

If Only They Could All Look Like This

It’s official. Today marks the LEAST amount of money we’ve spent at West Marine to date. That’s right, the decimal is in the right place … we spend a whopping $0.39 on 4 fasteners for the shower install.

Sailors Like To Be Clean Too

We spent the weekend getting a few new parts installed for liveaboard necessities. For some reason the former owner removed the shower system, but no worries Matt was able to install a more space and water efficient design that works perfectly for us.

Electric head install complete

This weekend’s refitting included Matt running wire from the breaker panel to the flush pump to power our new electric head.

Productive & Fun Labor Day Wknd

Deciding where to mount the manual back-up pump.
Installing the waste hose.Helping our marina neighbor load up his dinghy to be repaired.
Family stopped by for a fun visit and brought BBQ lunch for the crew.

Labor of Love

We spent this Labor Day weekend with one of our 1st major refit projects aboard Kaleo. September is dedicated to all things plumbing so we started with upgrading our manual-only toilet to an electric / manual back-up, Lavac. The 1st step was to have the holding tanks pumped out and rinsed followed by removing the old toilet. The greatest challenge was engineering a hose run that involved an electric pump, a manual back-up pump and a downhill run to the tank – all within the confines of the space below the v-berth.

We’re happy to report that with the help of Christie’s dad, Craig, the install was a success within “plan a” and without any sacrifices. We now have the convenience of an electric head with a manual back-up in case of power failure.

Related Posts Plugin for WordPress, Blogger...